Skip to content

SEWP VI ordering opens Nov 1, 2026. Norseman holds Category A contract 80TECH26D0154. How to order

Norseman Defense Technologies
Cybersecurity

Cyber Resilience and Zero Trust

Zero trust architecture, identity, post quantum cryptography, detection and response, and compliance (CMMC, NIST, FedRAMP) that keep you operating under attack.
Abstract technology artwork for the Cyber Resilience and Zero Trust practice

Security programs fail in the gaps between tools. Cyber Resilience and Zero Trust closes those gaps with an architecture first approach: identity, device, network, application, and data controls designed to work together, then monitored and tested.

Our engineers have implemented zero trust in the most demanding government networks. We apply the same frameworks, NIST SP 800-207, CMMC, and FedRAMP, to protect commercial revenue and customer data.

Zero trust also rests on cryptography. Identity, certificates, encrypted sessions and signed updates all depend on algorithms a capable quantum computer will break, so post quantum cryptography is part of the same architecture: we inventory where your cryptography lives and plan the migration against the federal dates.

What you get

  • A zero trust roadmap tied to your actual environment, not a vendor slide
  • A cryptographic inventory and a post quantum migration plan mapped to the 2030 and 2031 federal dates
  • Faster detection and response with fewer, better integrated tools
  • Ransomware recovery you have tested, not assumed
  • Audit ready evidence for CMMC, NIST, HIPAA, or PCI requirements
Cyber Resilience and Zero Trust

Post quantum cryptography: quantum ready by 2030

Zero trust rests on cryptography. Every identity check, device certificate, encrypted session and signed update depends on public key algorithms that a capable quantum computer will break. Post quantum cryptography keeps that foundation standing, so we treat it as part of zero trust and not as a separate project.

The mandate: dates written into policy

  1. January 1, 2027
    NSA CNSA 2.0, CNSSP 15

    New national security system acquisitions must be CNSA 2.0 compliant.

  2. December 31, 2030
    Executive Order 14412

    PQC key establishment on high value assets and high impact systems.

  3. December 31, 2031
    Executive Order 14412

    PQC digital signatures on those same systems.

  4. 2035
    OMB M-26-15, NIST IR 8547

    Remaining systems migrated. The draft NIST plan disallows RSA and ECC.

Also driving the work: NIST FIPS 203, 204 and 205 (August 2024), NSM-10, the Quantum Computing Cybersecurity Preparedness Act, the DoW PQC Strategy (June 2026) and agency migration plans under M-26-15 (due October 22, 2026).

What PQC mitigates

  • Harvest now, decrypt later. Traffic captured today is decrypted once a capable quantum computer exists.
  • Broken key exchange. Shor's algorithm defeats RSA, DH and ECC key establishment in TLS, VPN and SSH.
  • Forged signatures. Forged certificates, code and firmware signing undermine PKI and identity.
  • Long lived systems. Platforms fielded now will still be in service when today's algorithms fall.

The cost of inaction

  • Missed mandates. The EO 14412 dates are fixed. Agency migration plans were due to OMB on October 22, 2026.
  • Stalled acquisitions. CNSA 2.0 gates new national security system buys in 2027. EO 14412 directs a FAR rule for contractors.
  • A costlier migration. Late starts stack discovery, pilots and cutover into the same budget years.
  • Exposure you cannot recall. Every month of delay adds to the data already harvested.

Our phased approach, mapped to OMB M-26-15

    1. Step 1: Discover and inventory

      Scan network, endpoints, code and certificates. Build the cryptographic bill of materials (CBOM).

    2. Step 2: Assess and prioritize

      Rank by data lifetime, impact level and high value asset status.

    3. Step 3: Plan and architect

      Crypto agility design, vendor roadmaps, budget and contract vehicle.

    M-26-15 Phase 1
    Strategy and discovery, 2026 to 2027
    1. Step 4: Pilot and validate

      Lab and field pilots. Interoperability and CMVP checks.

    Phase 2
    Pilots, 2027 to 2028
    1. Step 5: Migrate and deploy

      Key establishment first, then signatures and PKI.

    Phases 3 and 4
    2028 to 2031
    1. Step 6: Operate and monitor

      Continuous discovery feeds the inventory. Certificate hygiene.

    Phase 5
    Full migration, 2035

Capabilities and solutions

  • Cryptographic discovery and CBOM: network, endpoint, code and certificates
  • PKI, certificate lifecycle, HSM and key management
  • Crypto agility architecture and CMVP validation checks
  • Integration lab and logistics in Annapolis Junction, Maryland

PQC partners: Keyfactor, EigenQ, XSOC, Thales

The federal dates bind agencies and reach their suppliers. Banks, health systems and other organizations with long lived data face the same harvest now, decrypt later risk, and the same six steps apply.

Start with a PQC readiness conversation

Bring your system list and leave with a first step.

Who it serves

Federal and commercial teams

Use cases

Related use cases

How to buy

Contract vehicles for this practice

Federal buyers most often order this practice on the vehicles below. Commercial customers buy direct from Norseman, with no contract vehicle needed.

Buying for a business? Talk to our commercial team.

Put Cybersecurity to work

Talk with an engineer about your environment, your timeline, and the fastest way to buy.

Ask Norseman (AI)